The best candidate is fully adhered glued down sheet vinyl flooring.
Tile over linoleum flooring.
As with laying tile over vinyl as long as the subfloor and joists provide a firm foundation the linoleum is well glued down in good shape and clean.
Tile if laying ceramic tile slate or stone you ll need to clean then sand or scratch up the old linoleum to provide a surface the mortar for the tile will adhere to.
This isn t possible with every flooring material but it s often possible to install ceramic porcelain or stone tile over resilient flooring including standard sheet vinyl vinyl tile or linoleum.
How to tile over linoleum laundry room and guest bathroom.
Not every form of resilient flooring is suitable for receiving tile directly.
I purchased a handy tool that measures.
Often when linoleum is installed only the edges and center are spot glued.
To ensure a level floor put down underlayment when laying a tile floor over linoleum.
If the linoleum was bonded to cement or to a good backerboard it is likely to remain stable and.
Any damage to your tile including cracks or jutting pieces will show through your new linoleum.
First you need to measure the space to see how many tiles you need.
When you re ready to install tile over linoleum a thin layer of mortar should be spread over the floor s surface with a flat edged trowel.
The hubby had already tiled over the linoleum in our laundry room before we moved in.
More tips for tiling over linoleum.
Before you start laying tiles over an old linoleum floor there are a few things that you need to know.
How old is the linoleum.
Make a tighter floor so that your tiles will lay flat by fastening with 1 rust proof screws or nails roughly every six inches on the linoleum flooring.
Sheet linoleum floors and tiles that were made before 1990 often contain asbestos which is a known cancer causing agent.
Before you begin installing a floating vinyl floor over ceramic tile completely clean the old tile.
You should be able to lay tile or marble over the linoleum.
Not only that the floor must be perfectly level or the tile will crack when it is walked on.
Portions of the linoleum floor can come up at any time.
After the thin layer has dried which should take about 30 minutes use a notched trowel to add a second layer over the first layer taking care to create even ridges over the surface.